1 / 4
DCS Basket 10 mm
Transfers load between slabs from day one at sawn contraction joints. No plastic sleeves.
- 4°trapezoidal plate
- 0plastic sleeves
- ACI 360R-10superflat floors
- On-site technical support
- Offices in Chile and Peru
What it's for
The joint moves. The edge doesn't have to break.
When two slabs move unevenly, the joint edge takes every wheel hit. DCS Basket keeps the plates at the correct height and spacing so the load passes from one slab to the next, as ACI standards recommend.
Limits spalling
Less impact on the joint edge.
Transfers the load
Positive, immediate transfer between slabs.
Reduces restraint
The slab shrinks without getting locked.
Features
How it's made

Primed trapezoidal plate with release agent
Its shape creates a void that allows lateral and longitudinal slab movement. That's why it doesn't need plastic sleeves.

Holder that sets height and spacing
Each plate is aligned, at the correct height within the slab and at the specified spacing. Installs quickly, horizontally or vertically.
Benefits
What it means for your project
- No plastic sleeves required
- Direct concrete-to-steel contact to control deflection
- Meets superflat floor (SFF) requirements per ACI 360R-10
- Allows lateral and longitudinal slab movement
- Lowers the risk of slab restraint
- Fast, precise placement, horizontal or vertical
Specifications
Quick specs
| Product | DCS Basket 10 mm |
|---|---|
| Use | Sawn contraction joints |
| Plate | 4° trapezoidal, primed and with release agent |
| Plastic sleeves | Not required |
| Reference standard | ACI 360R-10, superflat floors (SFF) |
| Installation | Horizontal or vertical |
Not sure what spacing to use?
Send us the slab thickness and the type of traffic. We'll help you define the configuration.
Ask for adviceFAQ
Frequently asked questions
Do the plates need plastic sleeves?
No. The 4° trapezoidal plate comes primed and with release agent, and its shape lets the slab move without sleeves.
Is it suitable for superflat floors?
Yes. It's designed to meet superflat floor (SFF) requirements per ACI 360R-10.
Can it be installed vertically?
Yes. It allows fast, precise placement both horizontally and vertically.
Complete the slab



