1 / 3
Spal-Pro Stabilizer EXP
Stops slab rocking by injecting rigid foam under the concrete. The floor is back in service in 60 minutes or less.
- 60 minreturn to service
- 45 mindeflection corrected
- 3–38 °Capplication temperature
- On-site technical support
- Offices in Chile and Peru
What it's for
If the slab moves, the joint breaks.
When a slab rocks or steps under forklifts, there is usually curling or voids in the subbase. Spal-Pro Stabilizer EXP is injected into those voids, expands and hardens into a high-density rigid foam that re-supports the slab.
Fills voids
Penetrates narrow gaps under the slab.
In service in 60 min
Corrects deflection in 45 minutes.
Tolerates moisture
Unaffected by wash water or leaks.
Benefits
What it means for your project
- High compressive strength to support loaded slabs
- Fast set, opens to traffic quickly
- Medium viscosity, easy to inject into narrow voids
- Insensitive to moisture and water infiltration
- Binds subgrade materials as it cures
- No CFCs or HFCs
Specifications
Quick specs
| Type | High-density hydrophobic polyurethane foam, 2 components |
|---|---|
| Solids | 100 % |
| Use | Stabilizing slabs with deflection or rocking |
| Deflection correction | 45 min after installation |
| Return to service | 60 min or less |
| Installation and service temperature | 3 °C a 38 °C |
Need help choosing?
Tell us the area in m², the type of traffic and the condition of the slab. We'll help you define the solution.
Ask for adviceFAQ
Frequently asked questions
Why does a slab rock?
It's usually caused by slab curling or subbase deficiencies that leave voids under the concrete.
How long until it's back in service?
Deflection is reduced within 45 minutes and the floor can return to service in 60 minutes or less.



